Innovative waste water management system deployed for Rochdale flood defence works
The first phase of the £56m Rochdale and Littleborough flood defence scheme is underway, using our innovative ‘rain-ready’ system to handle polluted water created by construction.

Silt pollution mitigation
We helped UK construction and regeneration group, Morgan Sindall Infrastructure, face a challenge at Trebanos Wastewater Treatment Works by preventing silt pollution during infrast…

Silt management on Scottish construction site
We supplied Balfour Beatty Power Transmission and Distribution with products to help protect the local water environment and win awards.

Bubbles prevent aggregate pollution
We worked with Water infrastructure and civil engineering specialists, Coffey, to create a solution to prevent pollution on a site in Severn Trent.

Bubble barrier protection for weir removal
Frog Environmental were delighted to support the West Wales Rivers Trust in a project involving the removal of a weir in the Loughor River.

Award winning water treatment system using Gel Flocculant protects conservation site with SSSI status
Gel Flocculant prevents silt pollution and protects the environment during construction, these products were approved for use on this SSSI.

Bubble Curtain achieves 90% aeration levels and limits silt during bank works
Our Bubble Curtain supported BAM’s environmental protection and water quality aims by keeping dissolved oxygen above 90% and restricting silt movement during a project valued at £1…

Bubble Curtains proven to reduce noise by 99% during marine construction
Our ground-breaking solution outperformed UK regulatory requirements, protected marine life and saved thousands of pounds in time costs for John F Hunt Regeneration Ltd during pili…

Zero carbon water treatment systems
Managing surface water from construction sites can cause major economic and environmental challenges. Our zero carbon water treatment system protects rivers and reduces carbon foot…
Pingback: Five reasons to be rain-ready (and control silt) on construction sites - frog environmental
Pingback: Meeting the pollution prevention gold standard in construction - frog environmental