Phosphorus Removal from Water

Gel Flocculant for Nutrient Removal

Supporting phosphorus and nutrient reduction through particle capture

Algae Removal Morning Day 1

We provide water treatment and phosphorus removal solutions to reduce nutrient overloading and prevent algal blooms in construction and industrial runoff.

Nutrients such as phosphorus often attach to fine soil particles. When these particles enter watercourses, they drive algal blooms, oxygen depletion and ecological harm.

Clearflow’s Gel Flocculant accelerates the capture of fine sediments and their associated nutrients, providing a practical treatment step to support compliance with tightening discharge consents in sensitive catchments.

We welcome further opportunities for pilot programmes in partnership with government agencies and academia in the UK.

Applications range from:
  • Construction and catchment storm water treatment
  • Road run-off management
  • Water treatment
  • Mining
Bacterius Algae in water
Flocculant-sediment-and-silt-control-block-800x600.jpg
IMG_9306 (Large)
<a href=Water Quality Investigation” data-src=”https://media.frogenvironmental.co.uk/uploads/2013/08/Blue-Green-Algae.jpg” data-options=”quality:80;hdQuality:80;resize:1;fit:crop;autostart:visible;” />
Key Benefits

Leading the way in nutrient pollution control

Particle bound nutrient removal

Gel Flocculant captures suspended particles that carry phosphorus and other nutrients

Regulator accepted

Gel Flocculant has been deployed on sensitive sites with strict discharge consents, where flocculation is an approved pathway for reducing particle bound phosphorus

Performance evidence

Reductions in phosphorus, COD and turbidity have been demonstrated in real-world case studies, including West Cumbria (UK) and Innisfil (Canada), supporting regulator acceptance.

Low cost, low carbon

Passive or pumped dosing avoids the high energy and chemical footprint of tank based treatments

Process-led approach

Our Settlement Testing part of the service confirms site chemistry, optimum formulation, dose and installation

Scalable technology

We support small construction discharges to road run-off and large scale mining or industrial applications

Technical specification

Form Dehydrated Gel Flocculant blocks, with formulations designed to target fine particulates for rapid settlement.
Mechanism Nutrients such as phosphorus are often particle bound. By flocculating and settling these particles, overall nutrient load is reduced.
Performance evidence Case studies demonstrate phosphorus reductions from 0.1 mg/l to 0.02 mg/l (West Cumbria, UK) and average phosphorus reductions of 90% in stormwater discharges (Innisfil, Canada), alongside reductions in TSS and COD.
Deployment options Passive flow systems for drains, channels and road run-off, or pumped deployment using GFR for higher flow or higher risk applications.
Whole life cost and carbon Lower footprint and operating cost compared with chemical dosing or settlement tanks, with carbon benefits from simple, passive operation.
Related

Water treatment systems

The Silt Mats worked perfectly, capturing sediment during excavation works of our new channel creation. We really appreciate your flexibility of getting them to us so swiftly.

Matthew Lyall, Senior Project Officer
Yorkshire Dales Rivers Trust

YDRT-LOGO-2048x516-1-e1702553673522

“With increasing UK rainfall over recent years, and anticipating potential delays, the site was designed with a rain-ready mitigation system to tackle the inevitable surface water.”

“Water is pumped through a Pipe Reactor where it is treated with Gel Flocculant to reduce settlement time, then into settlement ponds and a final polishing pond, which runs over a series of biodegradable mats to remove any remaining silt.”

Richard Walsh, Senior Project Manager
VolkerStein

“The rain-ready approach of using Silt Mats™, settlement ponds and Silt Capture Channels means the equipment remains in place year-round, ready for use whenever needed. Independent laboratory testing has shown that there is 99% reduction in total suspended solids and up to 99% reduction in iron. This means the water being discharged back into the river actually meets the threshold for drinking water standards.

“VolkerStevin contacted us early on in the process, giving plenty of time for discussion and review before the project’s critical works began. It really emphasises what can be achieved with early engagement towards water management.”

Gavin Beat, Senior Technical Specialist
Frog Environmental

“The key takeaway from this project is that it is possible to manage silt pollution to a very high standard with minimal incidents, even across huge scales, varying ground conditions and extreme weather.

“The Floc Mats proved to be a game changer providing innovative silt management. We are now using them on another overhead line project and look forward to the opportunity to work with Frog Environmental again in the future.”

Colin Mackay, Environmental Sustainability Manager (Scotland)
Balfour Beatty Power Transmission and Distribution

“Frog Environmental were knowledgeable, helping to establish a workable, cost-effective and low maintenance solution for site approved by the regulator.

They really understood the water management issues we had on site and worked with us to develop a solution which works, as well as engaging with our operatives to ensure that they could effectively manage the system.

It was a long regulatory process, but we understand the risks associated with working in such sensitive areas, especially with new and different products and the concerns Stakeholders may have, and they were brilliant in helping provide the necessary data to satisfy Regulator requirements.

We are delighted to have found a solution that prevents pollution and protects the environment, and ultimately allows us to continue with construction.”

Glenn Entwistle, Senior Environmental Advisor
Advance JV

“The Bubble Curtain has been a gamechanger for our rivers network and has become an internal success story. Thanks to the specialist support given by Frog Environmental’s Technical Team in design and planning, we got it right the first time.”

Brett Holmes, Site Agent
BAM Nuttall

The Kex Gill road realignment scheme is a challenging project with multiple environmental risks including management of silt and water quality of the surrounding environment given the locality of designated sites.

Frog Environmental are providing us with extensive technical support, including the design, supply and install of their silt control products on site to ensure the project minimises risks to the watercourses in the project vicinity and prevents impact on highly sensitive aquatic species.

It’s great to be working with them and we’re delighted with the success of the whole project.

Georgina King, Associate Director
RSK Environment

RSK

It’s good to see Frog getting involved with GT at the earliest stages of the project to help with planning out water management in advance of needing it.

Galliford Try

GT

Innovative solutions I’d not considered before.

Jacobs

Jacob

“The results (of the bubble curtain) were quite dramatic – in fact, startling… we have a workable solution that we’ve proved has a dramatic impact on noise propagation.” 

David McLaren, Site Manager – Marine & Civils
John F Hunt Regeneration

testimonial

“Frog Environmental were knowledgeable, helping to establish a workable, cost-effective and low maintenance solution for site approved by the regulator. They really understood the water management issues we had on site and worked with us to develop a solution which works, as well as engaging with our operatives to ensure that they could effectively manage the system.

We are delighted to have found a solution that prevents pollution and protects the environment, and ultimately allows us to continue with construction.”

Glenn Entwistle, Senior Environmental Advisor
Advance JV

1630479036967

“Thanks to Frog’s technical expertise and insight, we have found new ways to tackle these common issues and improve our site water management practices – from company-wide awareness and training to monitoring and prevention. As a consequence, we have made significant cost savings and lowered our carbon emissions.” 

Paul Thomas, Head of Environment
Winvic Construction

logo-winvic
Case Studies

Real solutions, proven results

Knowledge Hub

Sharing good practice

Constructionline
Acclaim logo
Achilles Network Stamp Gold
company-badge
IECA_MemberlogTagline_Global (2)
SafeContractor- RGB- navy
SafeContractor-Certification Seal